  • 2019

    A turnkey project of control system and analytical system upgrade

    Project Success Stories: A turnkey project of Control System and analytical system upgrade for Air Separation Unit (ASU) for Linde Indonesia by using PCS7

    Continue reading
  • 2019

    Alarm Management Workshop

    Murphy Oil Sabah – Alarm Management Workshop.

      Work scope:

    • To Facilitate Alarm Management Workshop as per ISA 18-2
    • Project Management, Engineering ( Siemens PCS7 V8.0 and SCADA WinCC V7.2 Modification )
    • Documentation ( Alarm Management Workshop report & Alarm Master Database for PCS and PSS System )
    • Site Implementation plan

    Continue reading
  • 2019

    Provision of Stainless Steel Panels Migration for IO Panel

    Murphy Oil Sabah – Provision of Stainless Steel Panels Migration for IO Panel ( EX-p Cabinet )

    • Design, engineering and testing of Ex-p Remote IO cabinet (316L SS), including air purging system
    • Compliance with IEC-Ex standard
    • Siemens conformal coating IO devices
    • Migration from existing to the new panel within a stipulated time (future)

    Continue reading
  • 2019

    Starting SATU (Syarikat Air Terengganu) project

    Project Success Stories: Starting SATU (Syarikat Air Terengganu) refurbishment project of an existing manual water treatment plant, to automate water treatment plant with PLC and to monitor multiple remote sites through the telemetry system.

    Continue reading
  • 2019

    10 years of relationship with Hanwha Q-cells

    Project Success Stories: With 10 years of relationship with Hanwha Q-cells, our expertise to contact, liaise and coordinate with other package contractors  to supply of Control System, Panels, Instrumentation, Cabling and installation works at site, Project Management, Engineering design, Testing and Commissioning.

    Continue reading
  • 2018

    Successfully migrated and replaced Murphy Oil Labuan’s obsolete Siemens IO modules

    Successfully migrated and replaced Murphy Oil Labuan’s obsolete Siemens IO modules and badly corrosion purge panels

    Continue reading
  • 2018

    Provision of Stainless Steel Panels Migration

    Murphy Oil Sabah – Provision of Stainless Steel Panels Migration for IO Panel ( EX-p Cabinet )

    • Design, engineering and testing of Ex-p Remote IO cabinet (316L SS), including air purging system
    • Compliance with IEC-Ex standard
    • Siemens conformal coating IO devices
    • Migration from existing to new panel within stipulated time (future)

    Continue reading
  • 2018

    Successfully commissioning 3000tons of Sugar Refinery Plant

    Successfully commissioning 3000tons of sugar refinery plant in MSM Malaysia Johor with fully Siemens Solution Platform in Level 0,1 and 2 (ISA 95 Model)

    Continue reading
  • 2017

    Starting Water Utilities in Selangor Command Centre Project

    Starting Water Utilities in Selangor Command Centre Project, this will be in full operation when the new SCADA System involving 250 sites is completed and incorporated in the Command Centre. Its capabilities would be to model water distribution piping systems which include tracking the flow of water in each pipe, the pressure at each node and the height of the water in each storage reservoir throughout the network during a simulation period.

    Continue reading
  • 2017

    Successfully migrate existing Boiler and Turbolog obsolete control system

    Project Success Stories: Successfully migrate existing Boiler and Turbolog obsolete control system to integrate with the current existing Siemens PCS7 and successfully commissioned and ready for plant start-up in 15days TAR period.

    Continue reading
Load more  
  • 2019

    A turnkey project of control system and analytical system upgrade

    Project Success Stories: A turnkey project of Control System and analytical system upgrade for Air Separation Unit (ASU) for Linde Indonesia by using PCS7

    Continue reading
  • 2019

    Alarm Management Workshop

    Murphy Oil Sabah – Alarm Management Workshop.

      Work scope:

    • To Facilitate Alarm Management Workshop as per ISA 18-2
    • Project Management, Engineering ( Siemens PCS7 V8.0 and SCADA WinCC V7.2 Modification )
    • Documentation ( Alarm Management Workshop report & Alarm Master Database for PCS and PSS System )
    • Site Implementation plan

    Continue reading
  • 2019

    Provision of Stainless Steel Panels Migration for IO Panel

    Murphy Oil Sabah – Provision of Stainless Steel Panels Migration for IO Panel ( EX-p Cabinet )

    • Design, engineering and testing of Ex-p Remote IO cabinet (316L SS), including air purging system
    • Compliance with IEC-Ex standard
    • Siemens conformal coating IO devices
    • Migration from existing to the new panel within a stipulated time (future)

    Continue reading
  • 2019

    Starting SATU (Syarikat Air Terengganu) project

    Project Success Stories: Starting SATU (Syarikat Air Terengganu) refurbishment project of an existing manual water treatment plant, to automate water treatment plant with PLC and to monitor multiple remote sites through the telemetry system.

    Continue reading
  • 2019

    10 years of relationship with Hanwha Q-cells

    Project Success Stories: With 10 years of relationship with Hanwha Q-cells, our expertise to contact, liaise and coordinate with other package contractors  to supply of Control System, Panels, Instrumentation, Cabling and installation works at site, Project Management, Engineering design, Testing and Commissioning.

    Continue reading
  • 2018

    Successfully migrated and replaced Murphy Oil Labuan’s obsolete Siemens IO modules

    Successfully migrated and replaced Murphy Oil Labuan’s obsolete Siemens IO modules and badly corrosion purge panels

    Continue reading
  • 2018

    Provision of Stainless Steel Panels Migration

    Murphy Oil Sabah – Provision of Stainless Steel Panels Migration for IO Panel ( EX-p Cabinet )

    • Design, engineering and testing of Ex-p Remote IO cabinet (316L SS), including air purging system
    • Compliance with IEC-Ex standard
    • Siemens conformal coating IO devices
    • Migration from existing to new panel within stipulated time (future)

    Continue reading
  • 2018

    Successfully commissioning 3000tons of Sugar Refinery Plant

    Successfully commissioning 3000tons of sugar refinery plant in MSM Malaysia Johor with fully Siemens Solution Platform in Level 0,1 and 2 (ISA 95 Model)

    Continue reading
  • 2017

    Starting Water Utilities in Selangor Command Centre Project

    Starting Water Utilities in Selangor Command Centre Project, this will be in full operation when the new SCADA System involving 250 sites is completed and incorporated in the Command Centre. Its capabilities would be to model water distribution piping systems which include tracking the flow of water in each pipe, the pressure at each node and the height of the water in each storage reservoir throughout the network during a simulation period.

    Continue reading
  • 2017

    Successfully migrate existing Boiler and Turbolog obsolete control system

    Project Success Stories: Successfully migrate existing Boiler and Turbolog obsolete control system to integrate with the current existing Siemens PCS7 and successfully commissioned and ready for plant start-up in 15days TAR period.

    Continue reading
Load more  
  • 2010

    Remote Operating Centre (ROC) project

    Remote Operating Centre (ROC) project to monitor remote sites from a central operation centre for 22 plants for Linde in South East Asia.

    Continue reading
  • 2009

    Secured first Syabas Water Distribution project

    Secured first Syabas Water Distribution project for 250 sites with Reservoir Telemetry system. 

    Continue reading
  • 2009

    Secured first project in Gas Distribution Telemetry System

    Secured first project in Gas Distribution Telemetry System in 11 sites for Gas Malaysia Berhad

    Continue reading
  • 2008

    Supply 700MW coal-fired power plant simulator

    Supply 700MW coal-fired power plant simulator with complied ANSI_ISA 77.20.01_2012 Fossil Fuel Power Plant Simulators -Functional Requirements for TNB Janamanjung

    Continue reading
  • 2008

    Reach 100 Edible Oils Control System Worldwide

    Successfully Deliver & Commissioning 100 Edible Oil Control System Worldwide. 

    Continue reading
  • 2007

    Develop 3rd Power Plant Simulator

    Developed 3rd power plant simulator with power plant process model and support Rheinmetall Defence Electronics GmbH’s German team in FAT.

    Continue reading
  • 2007

    Awarded with First Sugar Plant Vacuum Plant Automation system

    Awarded with First Sugar Plant Vacuum Plant Automation system in Indonesia, from manual control plant to automation control plant.

    Continue reading
  • 2006

    Successfully secured 3rd Power Plant Simulator

    Successfully secured 3rd power plant simulator with 700MW FOPS for TNB Manjung.

    Continue reading
  • 2006

    Awarded with first Siemens PCS7 Project

    Awarded with first Siemens PCS7 Project for IOI Acidchem Sdn Bhd in the Palm Oil Refinery Process Control System. 

    Continue reading
  • 2006

    First Viola GPRS project with Gas Malaysia

    First Viola GPRS project with Gas Malaysia for 33 remote sites by replacing their ageing analogue leased line from TM to GPRS System

    Continue reading
Load more  
  • 1999

    Monitor Port Tanjung Pelepas (PTP) Johor Substation

    We monitor Port Tanjung Pelepas (PTP) Johor Substation with Redundancy Fiber Optic Ring network connecting over 20 substations.

    Continue reading
  • 1998

    Secured first Offshore Oil & Gas platform telemetry project

    Secured first Offshore Oil & Gas platform telemetry project for Sarawak Shell using SCADAPack RTU from Control Microsystems 

    Continue reading
  • 1996

    Secured 2nd power plant simulator project (Canought Bridge)

    Secured 2nd power plant simulator project (Canought Bridge) with TNB. It is the first in the world that simulating 2 control systems namely ABB POS20 and Siemens OS265. We use Citect SCADA Software to emulate both ABB and Siemens HMI System for HMI Emulation.

    Continue reading
  • 1995

    Develop GASMAN Telemetry Solution System

    Develop GASMAN Telemetry Solution System with more than 100 remote sites in Malaysia for Mox Linde (Formerly Malaysia Oxygen Berhad) which is known as TelMox presently.

    Continue reading
  • 1995

    First Toshiba PCS6000 with Citect (Ver 3) Project

    Awarded with first Toshiba PCS6000 with Citect (Ver 3) Project for Revertex Reactor G Emulsion Plant.

    Continue reading
  • 1993

    IWK Damansara Sewerage Treatment Plant Control System

    The first Citect project in IWK Damansara Sewerage Treatment Plant Control System with Omron PLC.

    Continue reading
  • 1990

    First Worldwide business project secured in Sri Lanka

    In 1990, PC marked a major milestone, began with the first Worldwide business project secured in Sri Lanka for Ansell with Toshiba DCS Control System.

    Continue reading
  • 1989

    Delivered the first FOPS (Falling Object Protecting Structure) Simulator

    Delivered the first FOPS (Falling Object Protecting Structure) Simulator to TNB Integrated Learning Solution (ILSAS)

    Continue reading
  • 1989

    First Hydrogen (hydrogenation) Plant

    Commissioning First hydrogen (hydrogenation) plant with Acidchem.

    Continue reading
  • 1987

    First DCS System Implementation

    First Toshiba completes DCS System implementation for Melting & Boiling Process installation in Sugar Refinery Industry.

    Continue reading
  • 1986

    First Palm Oil Mill Project for Felda

    On the same year in September, we are awarded first Palm Oil Mill Project for Felda, collaboration with Ibarat Engineering Japan by providing PLC Automation Solution.

    Continue reading
  • 1986

    Secured first FOPS Simulator project in ASEAN

    Precision Engineering successfully secured first FOPS Simulator project in ASEAN. A combination of Software Modeling for process in Gould Super-Mini Computer and integrating Bailey Network 90 Control System.

    Continue reading
  • May 1985

    First Industrial Gases Project in CO2 Plant @ Port Dickson

    In the first year, we got our first Industrial Gases Project in CO2 Plant @ Port Dickson using Omron PLC and working on Power Plant Simulator for Fossil-Fuel Power Plant Simulator (FOPS Kapar – 300MW).

    Continue reading

PC Group Info

  • About PC
  • Timeline
  • PC Culture
  • PC Workplace
  • Industries

Information Link

  • News & Events
  • Blogs
  • Career
  • Privacy Policy
  • Contact Us

Core Solutions

  • IIoT & Industry 4.0
  • Industrial Automation
  • Electrical & Instrumentation Installation
  • Products Distribution
  • Maintenance & Support

Core Services

  • Project Management
  • Software Development
  • Design and Specification
  • IT / OT Integration
  • Support Services
  • Training and Education

Group of Companies

  • YNY Technology Sdn Bhd
  • Pro Cahaya Industries Sdn Bhd
  • PC Installation & Contracting Sdn Bhd
  • Precision Control Sdn Bhd
  • Precision Control (Penang) Sdn Bhd
  • PC Control & Engineering Pte Ltd

© 2025 PC GROUP. ALL RIGHTS RESERVED.

  • Follow Us:

  • Home
  • About
    • About Us
    • Timeline
    • Group Of Companies
    • PC Culture
    • PC Workplace
  • Core Solutions
    • IIoT & Industry 4.0
    • Industrial Automation
    • Electrical & Instrumentation Installation
    • Products Distribution
    • Maintenance & Support
  • Our Services
    • Project Management
    • Software Development
    • Design and Specification
    • IT / OT Integration
    • Support Services
    • Training and Education
  • Industries
    • All Industries
    • Industrial Gases
    • Water & Wastewater
    • Edible Oil, Oleochemical & Biodiesel
    • Food & Beverages
    • Oil & Gas
  • Careers
    • Careers
    • Job Opportunities
    • Internship
  • Resources
    • News & Events
    • Blogs
    • Project References
  • Contact Us